22JAN10: Start of the 'flat pack' hut
construction |

31JAN10: Hut with door and some side
panels |

14FEB10: Hut now with sides and roof
|

22FEB10: Hut more or less completed
|
06MAR10: Levelling the site for hut
foundations |
24MAR10: The spoil heap (borrowed from Caine
Hill) |
24APR10: Rosie & Alice Audsley emptying
Caine Hill spoil bags |
26APR10: Jeff Price by the almost complete
foundation. |
27APR10: Digging hut foundations more or less
complete. |
27APR10: General view of the intended
location of the digging hut. |
03MAY10: Jeff drilling a boulder by the
shaft, Slug checking all is OK. |

03MAY10: Jeff breaking a boulder - (not
posed, see the flying stone dust). |

03MAY10: The boulder split and ready to be
removed |

03MAY10: Hauling out the boulder |

03MAY10: Got it! |

14MAY10: The hut frame arrives at the
dig |

14MAY10: The framework awaiting
cladding. |

16MAY10: The completed hut - well
almost. |

16MAY10: Jeff & Slug watch Chris attack
the boulder |

16MAY10: The boulder hauled out of
position |
16MAY10: The remains of the boulder
|

30MAY10: Slug digging a hole, supervised by
Batspiss. |

09JUN10: The cleared area at the top of the
shaft |

12JUN10: Tony digging in anti-horsefly
kit. |

15JUN10: Preparing MK II hinges. |

25JUN10: Les Oxborough working on the
shuttering on the top of the shaft. |

29JUN10: The sheave wheel for the
headframe |

01JUL10: Les Oxborough's shuttering for
the top of the shaft |

01JUL10: "Drip enough on, some is bound
to stick" |

04JUL10: Formwork and concrete on top of the
shaft |

04JUL10: Drainage trench between the shaft
and the sump. |
05JUL10: The Mother Of All Brackets
|

05JUL10: Drain pipes roughly in position in
the trench |

08JUL10: The raised and flattened shaft
top |

08JUL10: Alice excavating the drainage
chamber |

08JUL10: Les fiddling with the
pipework |

08JUL10: The grill on top of the shaft; note
the hole for the drainage chamber on right. |

11JUL10: Les grouting the drain cover
|
12JUL10: Shaft and the drain cover which
defines the lowest point of the
collar/apron/whatdoyoucallit? |

15JUL10: Les and Alice working on the
foundation (blinding it) |

16JUL10: The safety cage with four scaffs as
a dummy headframe, with the feet in position |
17JUL10: The first segment of the pad ready
for concreting |

22JUL10: Les shovelling concrete, Alice
measuring out the cement. |
22JUL10: The finished section of the PATIO
(with drain) |

24JUL10: Les laying concrete, Alice measuring
out the cement |
24JUL10: The 'patio' three fifths
completed |

26JUL10: Slug, measuring out aggregate
|

01AUG10: Tony building the retaining
wall.
(Photo Ian Gregory) |

03AUG10: The second course of blocks part
completed |

05:AUG10: The completed wall around the
shaft |

11AUG10: Welding up the tipping skip.
|

21AUG10: The part completed head frame. |

22AUG10: Phil Romford checking the wheel
alignment. |

28AUG10: The power winch in the engine
house. |

18SEP10: Alice and Les by the headframe
|

19SEP10: Jeff and digging bucket
|

25SEP10: The headframe with traverse and tipping bucket
|

07OCT10: Mike Wilson fixes the concrete mixer
|

21OCT10: Cutting the frame for the shaft
doors |

21OCT10: Testing the shaft door frame for
fit |

22OCT10: The part finished shaft doors |

28OCT10: The shaft doors (open) |

28OCT10: The shaft doors (closed) |

28OCT10: (Labouring the point even
further) |

23DEC10: Home Close Hole in the snow
|